JVACEE 30 New Vacancies, July 2022

0

JVACEE 30 New Vacancies

JVACEE is a joint venture company of Arab contractor and El-sewedy Electric, dealing with the scope of Engineering, Procurement and Construction of Julius Nyerere Hydropower Project in Stigler’s Gorge in Tanzania. It is expected to produce 2,115 MW of installed Capacity. On the waters of the Rufiji river, in joint venture with The Arab Contractors of Egypt (Osman A. Osman & Co.), ELSEWEDY ELECTRIC is entrusted by the people and government of Tanzania to execute, The Julius Nyerere Hydropower Project. This national mega project that would secure clean power supply to more than 60 million Tanzanians.

READ ALSO

. Job opportunities at Vodacom

Julius Nyerere Hydropower Station (JNHS; RHHP; Rufiji Hydroelectric Power Project; Stiegler’s Gorge Dam) is a hydroelectric dam under construction across the Rufiji River in eastern Tanzania. Although controversial, the government approved the plans in 2018. The power station is expected to have an installed capacity of 2,115 megawatts (2,836,000 hp) and to produce 5,920GWh of power annually.

30 NEW VACANCIES AT JVACEE ( JULIUS NYERERE HYDRO POWER PROJECT (JNHPP)), JULY 2022

We are looking for the below mentioned positions to be filled immediately. View full details from the PDF Document attached below:

DOWNLOAD PDF HERE TO SEE JOB VACANCIES

Leave A Reply

Your email address will not be published.